If you can’t hide - underline !!
We always keep this principle in service, but it especially helps out when we encounter a technological problem during the manufacturing process of an order or when the builders “something went wrong”)) A living example at one of the sites commissioned this year. In the dressing room, a closet was designed, which was to be mounted clearly under the gypsum frieze, for which the ceiling is correspondingly lowered.
Everything went according to plan - we made a model, drawings, everything was agreed with the designer and the customer. Based on the agreed dimensions, the author of the project prepared the technical task of the construction team to perform the demotion. And at the time of the control measurement, upon the fact that the builders completed the technical task, it turns out that the lowering is formed at a distance much greater than planned. Having set the cabinet under the resulting lowering, we push it so that the sidewall of this cabinet closes the casing of the doorway located very close by. All construction work in the room at this stage was completed and dismantling the lowering meant performing wet work again, which of course would entail serious labor and material costs. And here the process of finding a solution began - how to beat the situation with our forces. There were many ideas - they put forward columns, added shelves ... but it all looked strange ...
As a result, the author of the project had a brilliant idea - to make emphasized decorated mirrors on the sidewall !!
As a result, the author of the project had a brilliant idea - to make emphasized decorated mirrors on the sidewall !! The only thing left is to develop nodes for integrating new parts with existing ones. Our designer, brilliantly coped with this task, thanks to his experience, professionalism and the slogan “you can’t hide - emphasize))”